A trial run launched for the main route of a Dadukou upgrade project-华龙网
A trial run launched for the main route of a Dadukou upgrade project

2025-05-16 01:03
听新闻
图片1

CHONGQING (CQNEWS) -- On May 12, the temporary opening of the upgraded section between Shuangshan Tunnel and Wutaishan Interchange in Dadukou District delivered much-needed relief to the area’s congested roadways.

Recently, the main route of the Shuangshan Tunnel-Wutaishan Interchange renovation project—including the elevated Chentuo Road viaduct and Hengsheng Ditong Section—has been partially opened for trial traffic. Spanning 2.94 kilometers, the project connects Shuangshan Tunnel in Dadukou District (southern endpoint) to Wutaishan Interchange in Jiulongpo District (northern endpoint). The transformed main route has been expanded to a six-lane bidirectional highway with a 60 km/h design speed, significantly boosting traffic capacity and flow efficiency. (Photographed by Liu Yingcheng / Vision Chongqing) 

(Translated by Yuki, Fathom Language Limited)

责任编辑:江夷玮
附件下载:
热点推荐
最新评论
我来说两句...... 发送
查看全部评论 >

参与评论积分 龙珠商城兑好礼

打开第1眼TV-华龙网查看全部评论 >

分享成功
相关推荐